CARE AND MAINTENANCE
During Construction
The construction period is often the most hazardous time for a factory-finished window or door. During this time, the product can be subject to atypical use and heavy traffic from various Trades who may not be familiar with the product. Trades should be reminded that the windows and doors are a finished product which has been installed into a rough construction environment.
Special attention and care should be given to your Tischler products during construction to maximize the lifespan and performance of the products. Please take a moment to review the following guidelines and recommendations for care of the Tischler units.
Initial Glass Inspection
Your glass has been pre-inspected for scratches and defects at the factory.
Please re-inspect the glass immediately upon delivery and advise Tischler of any potential damage that may have occurred during shipment or delivery within ten (10) business days of the delivery.
All scratches and physical damage to the glass after this timeframe will be considered damage that has occurred on site by others.
Glass & Finish
Glass and factory finishes can be susceptible to scratches and damage by caustic materials and/or sharp tools. The glass panes on the product have been “wet glazed” with a perimeter sealant, bonding the glazing to the sash and to the finish. This perimeter seal is vital to the integrity of the product, whose purpose is to hermetically seal the glass to the sash, and to prevent water intrusion into the glazing cavity, which can lead to seal failure.
During construction, it is critical to protect the finish of the units and the surface of the glass from the corrosive elements which are often present during the construction phase of a project (plaster, mortar, stucco, etc).
Cleaning Instructions
The glazing, sealants, and finishes can be damaged with improper cleaning procedures. When cleaning the units:
-
-
-
- Use only clean water with a mild, household cleaning agent. If the product is exposed to corrosive elements, clean the product immediately.
- Change water frequently – any sand/concrete residue in the water will scratch the glass.
- Use only clean, soft sponges and clothes or paper towels. Be sure to rinse frequently and ensure that any particulate has been removed before proceeding to clean the glass. The most common way to scratch a glass pane is by attempting to clean the panes with a dirty sponge or rag.
- NEVER use pointed or sharp tools (such as razor blades) on the glass surface. This can scratch the glass and is likely to damage the bond of the perimeter sealant, leading to leaks and potential seal failure.
- If the product must be protected and covered with plastic or similar methods during adjacent work, it is important not to leave the coverings on for an extended period (limit it to days, not weeks) and only attach the coverings with a delicate surface painters tape. Please be advised that colored films on the glass can generate heat gain and lead to potential thermal stress cracks which are not covered under the glass warranty.
-
-
General Care During Construction
Units should be closed and the perimeter hardware locked and engaged during construction, whenever possible, but at a minimum at the end of each day. Wood will acclimate as the units are exposed to a volatile environment when humidity and moisture levels are not regulated until the home is dried in and the space is conditioned. Locking the perimeter hardware will help ensure the operable sashes will be properly aligned with their frames while they are engaged in place, reducing the risk for warpage. This is particularly important on operable doors where they may be passively latched for traffic during the day. Please be sure to engage the multipoint hardware and secure the sash at the end of each working day.
Thresholds, wood sills, sliding tracks, and the space between sashes and frames should be cleared of construction debris daily. Construction debris can not only scratch the finish of a threshold or sill, but can also lead to damage of the gaskets which seal the products.
If any operational issues arise after installation, compromising a unit or the hardware during the construction phase, please bring the issues to the attention of the Tischler Project Manager or Tischler Service Department as soon as possible so they can be rectified.
Contact Us Directly
For any additional questions or concerns, please reach out to us directly.
Each Tischler project was managed by a dedicated project manager who will be familiar with your project; our service department will be happy to answer questions and provide additional assistance.
Browse Our Products
Impact
Hurricane-resistant glazings, customized for coastal designs.
Air-lux
Swiss specialty products with inflatable gaskets and unique systems for descending units.
Metal
Thermally broken, energy-efficient and patented construction for reliable endurance.